<?xml version="1.0"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
   <channel>
      <title>Blog www.carlyon.co.nz</title>
      <link>http://www.carlyon.co.nz/blog/</link>
      <description>The latest Blog feeds from www.carlyon.co.nz</description>
      <language>en-us</language>
      <pubDate>Fri, 10 Jul 2026 00:53:56 +1200</pubDate>
      <generator>Rocketspark</generator>
      <atom:link href="http://www.carlyon.co.nz/blog/rss/" rel="self" type="application/rss+xml" />
      	      <item>
	         <title>Our New Website Is Live</title>
	         <link>http://www.carlyon.co.nz/blog/post/167281/our-new-website-is-live/</link>
	         	         <description>We are proud to launch the new Carlyon website. It is live, it is brand new, and it is built to give you the full picture of what we do....</description>
	         <pubDate>Fri, 10 Jul 2026 00:00:00 +1200</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167281</guid>
	      </item>
      	      <item>
	         <title>Fewer Surprises on Site: How 3D Modelling Drives Carlyon&amp;#039;s End-to-End Design and Build</title>
	         <link>http://www.carlyon.co.nz/blog/post/167272/3d-modelling-design-and-build/</link>
	         	         <description>Every complex build carries risk. Pipes that clash. Steel that does not line up. A late change that ripples through the whole project and blows out the timeline. At Carlyon, we are cutting that risk down at the source, before a single component hits the ground.We are continuing to grow our end-to-end design and build capability, and detailed 3D modelling sits right at the heart of it....</description>
	         <pubDate>Wed, 08 Jul 2026 09:29:25 +1200</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167272</guid>
	      </item>
      	      <item>
	         <title>The Work You Do Not See: Inside the Final Stretch of a Major Build</title>
	         <link>http://www.carlyon.co.nz/blog/post/167274/inside-a-major-build/</link>
	         	         <description>Some jobs make the highlight reel when they finish. But the real work happens long before that, in the early mornings, the late nights, and the hundreds of small decisions that keep a complex project moving. One of our biggest projects is now heading into its final stretch, and it is a good moment to talk about what actually gets a build like this over the line....</description>
	         <pubDate>Wed, 20 May 2026 00:00:00 +1200</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167274</guid>
	      </item>
      	      <item>
	         <title>Six Tanks, One Team: Custom API 650 Storage Tanks for a New Processing Plant</title>
	         <link>http://www.carlyon.co.nz/blog/post/167275/api-650-storage-tanks/</link>
	         	         <description>When a new processing plant needs storage tanks built to an exacting standard, the margin for error is zero. Recently the Carlyon teams delivered and installed six tanks for a new processing plant, and three of them were designed and built by us, start to finish....</description>
	         <pubDate>Wed, 10 Dec 2025 00:00:00 +1300</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167275</guid>
	      </item>
      	      <item>
	         <title>A New Chapter for Carlyon: Welcoming David Kraakman Back as Managing Director</title>
	         <link>http://www.carlyon.co.nz/blog/post/167278/leadership-update-david-kraakman/</link>
	         	         <description>Businesses grow through the people who lead them, and today we are sharing some leadership news at Carlyon. As we move into our next stage of growth, we are welcoming a familiar face back to the helm and saying a genuine thank you to a leader who has guided us well....</description>
	         <pubDate>Mon, 01 Dec 2025 00:00:00 +1300</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167278</guid>
	      </item>
      	      <item>
	         <title>Refuelling on the Water: The Refreshed Fuel Dock at Tauranga Bridge Marina</title>
	         <link>http://www.carlyon.co.nz/blog/post/167280/tauranga-marina-fuel-dock/</link>
	         	         <description>Boaties heading out of Tauranga Bridge Marina now have a smarter, safer refuel to look forward to. The marina&#039;s fuel dock has been refreshed and is up and running, and the Carlyon team is proud to have delivered it....</description>
	         <pubDate>Wed, 05 Nov 2025 00:00:00 +1300</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167280</guid>
	      </item>
      	      <item>
	         <title>Ready for the Summer Rush: 24/7 Fuel System Servicing That Keeps You Running</title>
	         <link>http://www.carlyon.co.nz/blog/post/167277/24-7-fuel-system-servicing/</link>
	         	         <description>When summer hits, the country gets moving. Roads fill up, tanks empty faster, and demand on the nation&#039;s fuel network climbs. That is exactly when a fuel site cannot afford downtime, and exactly when our Service Team earns its stripes....</description>
	         <pubDate>Thu, 21 Aug 2025 00:00:00 +1200</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167277</guid>
	      </item>
      	      <item>
	         <title>Bringing a New Fuel Brand to Market: The U-GO Fuels Site in Hillsborough</title>
	         <link>http://www.carlyon.co.nz/blog/post/167285/u-go-fuels-hillsborough/</link>
	         	         <description>Getting a brand-new fuel site trading takes more than pouring some concrete and bolting in a pump. When U-GO Fuels came to market with their new site in Hillsborough, Carlyon was proud to help make it happen....</description>
	         <pubDate>Wed, 09 Jul 2025 00:00:00 +1200</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167285</guid>
	      </item>
      	      <item>
	         <title>Safe, Compliant Tank Removal, From Dismantling to Full Site Restoration</title>
	         <link>http://www.carlyon.co.nz/blog/post/167286/tank-decommissioning-removal/</link>
	         	         <description>A tank at the end of its life is not something to take lightly. Ex-hydrocarbon and chemical tanks need to come out safely, be disposed of properly, and leave the site clean and compliant behind them. That is exactly what Carlyon does....</description>
	         <pubDate>Mon, 16 Jun 2025 00:00:00 +1200</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167286</guid>
	      </item>
      	      <item>
	         <title>A 55,000-Litre Custom Build: Installing a Pentane Storage Tank for a Manufacturing Client</title>
	         <link>http://www.carlyon.co.nz/blog/post/167288/55000l-pentane-storage-tank/</link>
	         	         <description>Some storage jobs come off a shelf. This one did not. Carlyon&#039;s Projects team recently completed the successful installation of a 55,000 litre pentane storage tank, designed and built from scratch for one customer&#039;s specific needs....</description>
	         <pubDate>Tue, 13 Aug 2024 00:00:00 +1200</pubDate>
	         <guid>http://www.carlyon.co.nz/blog/#post167288</guid>
	      </item>
         </channel>
</rss>
