Skip to main content

Back to Blog

Our New Website Is Live

We are proud to launch the new Carlyon website. It is live, it is brand new, and it is built to give you the full picture of what we do....

July 10, 2026

Fewer Surprises on Site: How 3D Modelling Drives Carlyon's End-to-End Design and Build

Every complex build carries risk. Pipes that clash. Steel that does not line up. A late change that ripples through the whole project and blows out the timeline. At Carlyon, we are cutting that risk down at the source, before a single component hits the ground.We are continuing to grow our end-to-end design and build capability, and detailed 3D modelling sits right at the heart of it....

July 8, 2026

The Work You Do Not See: Inside the Final Stretch of a Major Build

Some jobs make the highlight reel when they finish. But the real work happens long before that, in the early mornings, the late nights, and the hundreds of small decisions that keep a complex project moving. One of our biggest projects is now heading into its final stretch, and it is a good moment to talk about what actually gets a build like this over the line....

May 20, 2026

Six Tanks, One Team: Custom API 650 Storage Tanks for a New Processing Plant

When a new processing plant needs storage tanks built to an exacting standard, the margin for error is zero. Recently the Carlyon teams delivered and installed six tanks for a new processing plant, and three of them were designed and built by us, start to finish....

December 10, 2025

A New Chapter for Carlyon: Welcoming David Kraakman Back as Managing Director

Businesses grow through the people who lead them, and today we are sharing some leadership news at Carlyon. As we move into our next stage of growth, we are welcoming a familiar face back to the helm and saying a genuine thank you to a leader who has guided us well....

December 1, 2025

Refuelling on the Water: The Refreshed Fuel Dock at Tauranga Bridge Marina

Boaties heading out of Tauranga Bridge Marina now have a smarter, safer refuel to look forward to. The marina's fuel dock has been refreshed and is up and running, and the Carlyon team is proud to have delivered it....

November 5, 2025

Ready for the Summer Rush: 24/7 Fuel System Servicing That Keeps You Running

When summer hits, the country gets moving. Roads fill up, tanks empty faster, and demand on the nation's fuel network climbs. That is exactly when a fuel site cannot afford downtime, and exactly when our Service Team earns its stripes....

August 21, 2025

Bringing a New Fuel Brand to Market: The U-GO Fuels Site in Hillsborough

Getting a brand-new fuel site trading takes more than pouring some concrete and bolting in a pump. When U-GO Fuels came to market with their new site in Hillsborough, Carlyon was proud to help make it happen....

July 9, 2025

Safe, Compliant Tank Removal, From Dismantling to Full Site Restoration

A tank at the end of its life is not something to take lightly. Ex-hydrocarbon and chemical tanks need to come out safely, be disposed of properly, and leave the site clean and compliant behind them. That is exactly what Carlyon does....

June 16, 2025

A 55,000-Litre Custom Build: Installing a Pentane Storage Tank for a Manufacturing Client

Some storage jobs come off a shelf. This one did not. Carlyon's Projects team recently completed the successful installation of a 55,000 litre pentane storage tank, designed and built from scratch for one customer's specific needs....

August 13, 2024

Built to Withstand Fire: The Phoenix Fire Rated Tank Range

ITS TAKEN SOME GRIT, TENACITY AND A PROFESSIONAL TEAM - BUT WE HAVE DONE IT.Carlyon are pleased to announce the launch of our new “Pheonix (2 and 4 hour) Fire Rated” flammable and combustible liquid storage tank.Tested and Approved to an international test standard (SwRI 95-03), you can be assured of a robust, high-quality product that will bring some real benefits....

July 15, 2024 Posts 1-11 of 11 | Page